MOQ: | 2 mt |
Standard Packaging: | 25 kg small P.P bags, then put in 1MT New Big Water proof HDPE Bags Suitable for Seaworthy Transportation. |
Delivery Period: | 5-8 working days |
Payment Method: | L/C,D/A,D/P,T/T |
Supply Capacity: | 2000 ton per month |
High Temperature Resistance Dry Ramming Mass Good Stability Long Lining Life Dry Refractory Ramming Mass
The advantages of dry ramming mass mainly include the following:
Application Scenarios of Dry Ramming Mass:
1. Coreless Induction Furnaces
2. Channel Induction Furnaces
MOQ: | 2 mt |
Standard Packaging: | 25 kg small P.P bags, then put in 1MT New Big Water proof HDPE Bags Suitable for Seaworthy Transportation. |
Delivery Period: | 5-8 working days |
Payment Method: | L/C,D/A,D/P,T/T |
Supply Capacity: | 2000 ton per month |
High Temperature Resistance Dry Ramming Mass Good Stability Long Lining Life Dry Refractory Ramming Mass
The advantages of dry ramming mass mainly include the following:
Application Scenarios of Dry Ramming Mass:
1. Coreless Induction Furnaces
2. Channel Induction Furnaces