OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy

OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy

MOQ: 2 mt
Standard Packaging: 25 kg small P.P bags, then put in 1MT New Big Water proof HDPE Bags Suitable for Seaworthy Transportation.
Delivery Period: 5-8 working days
Payment Method: L/C, D/A, D/P, T/T
Supply Capacity: 2000 ton per month
Detail Information
Place of Origin
China
Brand Name
HXS
Certification
ISO9001:2015
Model Number
HA
Lining:
Induction Furnace Lining Materials
Installation Method:
Dry Ramming
Application:
Lining For Induction Furnace
Refractoriness:
1700°C
Thermal Shock Resistance:
Excellent
Suitable Metal:
Al, Zn, Pb Alloy
Highlight:

Industrial Refractory Material Ramming Mass

,

OEM Refractory Material Ramming Mass

Product Description

How to Properly Install Dry Ramming Mix for Optimal Performance

Proper installation is crucial to maximizing the performance and lifespan of dry ramming mix. In this article, we provide a step-by-step guide to installing dry ramming mix in foundry furnaces.

Step 1: Surface Preparation

  • Clean the furnace shell to remove any debris or old refractory material.

  • Ensure the surface is dry and free of moisture.

Step 2: Mixing the Material

  • Use the dry ramming mix as supplied; no additional water or binders are required.

  • For large installations, consider using a mechanical mixer to ensure uniformity.

Step 3: Application

  • Apply the dry ramming mix in layers, typically 50-100 mm thick.

  • Compact each layer using pneumatic or manual ramming tools.

Step 4: Curing

  • Allow the lining to cure naturally for 24-48 hours.

  • Gradually heat the furnace to remove any residual moisture.

Step 5: Inspection and Maintenance

  • Regularly inspect the lining for signs of wear or damage.

  • Perform minor repairs as needed to extend the lining's lifespan.

Tips for Success

  • Use the right tools and equipment for compaction.

  • Follow the manufacturer's guidelines for layer thickness and curing times.

  • Train your staff on proper installation techniques.

Conclusion

Proper installation of dry ramming mix is essential for achieving optimal performance and longevity. By following these steps, you can ensure a durable and efficient furnace lining that meets your foundry's needs.

OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy 0OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy 1OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy 2OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy 3OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy 4

products
PRODUCTS DETAILS
OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy
MOQ: 2 mt
Standard Packaging: 25 kg small P.P bags, then put in 1MT New Big Water proof HDPE Bags Suitable for Seaworthy Transportation.
Delivery Period: 5-8 working days
Payment Method: L/C, D/A, D/P, T/T
Supply Capacity: 2000 ton per month
Detail Information
Place of Origin
China
Brand Name
HXS
Certification
ISO9001:2015
Model Number
HA
Lining:
Induction Furnace Lining Materials
Installation Method:
Dry Ramming
Application:
Lining For Induction Furnace
Refractoriness:
1700°C
Thermal Shock Resistance:
Excellent
Suitable Metal:
Al, Zn, Pb Alloy
Minimum Order Quantity:
2 mt
Packaging Details:
25 kg small P.P bags, then put in 1MT New Big Water proof HDPE Bags Suitable for Seaworthy Transportation.
Delivery Time:
5-8 working days
Payment Terms:
L/C, D/A, D/P, T/T
Supply Ability:
2000 ton per month
Highlight

Industrial Refractory Material Ramming Mass

,

OEM Refractory Material Ramming Mass

Product Description

How to Properly Install Dry Ramming Mix for Optimal Performance

Proper installation is crucial to maximizing the performance and lifespan of dry ramming mix. In this article, we provide a step-by-step guide to installing dry ramming mix in foundry furnaces.

Step 1: Surface Preparation

  • Clean the furnace shell to remove any debris or old refractory material.

  • Ensure the surface is dry and free of moisture.

Step 2: Mixing the Material

  • Use the dry ramming mix as supplied; no additional water or binders are required.

  • For large installations, consider using a mechanical mixer to ensure uniformity.

Step 3: Application

  • Apply the dry ramming mix in layers, typically 50-100 mm thick.

  • Compact each layer using pneumatic or manual ramming tools.

Step 4: Curing

  • Allow the lining to cure naturally for 24-48 hours.

  • Gradually heat the furnace to remove any residual moisture.

Step 5: Inspection and Maintenance

  • Regularly inspect the lining for signs of wear or damage.

  • Perform minor repairs as needed to extend the lining's lifespan.

Tips for Success

  • Use the right tools and equipment for compaction.

  • Follow the manufacturer's guidelines for layer thickness and curing times.

  • Train your staff on proper installation techniques.

Conclusion

Proper installation of dry ramming mix is essential for achieving optimal performance and longevity. By following these steps, you can ensure a durable and efficient furnace lining that meets your foundry's needs.

OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy 0OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy 1OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy 2OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy 3OEM Industrial Pre Mixed Refractory Material Ramming Mass For Aluminum Zinc Alloy 4